The weight | 9T |
Drilling diameter | 140-325mm |
Drilling depth | 300m |
One-time advance length | 6.6m |
Walking speed | 2.5km/h |
Climbing angles | Max.30° |
Equipped capacitor | 84KW |
Using air pressure | 1.7-3.0Mpa |
Air consumption | 17-35m³/min |
Drill pipe diameter | Φ76 mm φ89mm φ102 |
Drill pipe length | 1.5m 2.0m 3.0m |
Rig lifting force | 20T |
Swing speed | 55-115 rpm |
Swing torque | 6200-8500N.m |
Dimension | 5900x2000x2850mm |